Our company signed three OKTW700 three-wheel CNC powerful spinning machines with Jiangsu Guofu Hydrogen Energy Technology and Equipment Co., Ltd., two of which were delivered on August 15th, and the last one was formally installed in early September and put into trial operation for one week. Therefore, our company arranged for delivery on September 26, 2023.
The OKAYFB1605 CNC flanging machine signed between our company and Kruger Ventilation Industry Co., Ltd. of India on November 21st, 2022 was delivered on September 20th.
The OKAYD800 double-wheel spinning machine signed by our company and Wanfeng Technology (Yunnan) Co., Ltd. on November 21, 2022 was officially installed in early September and put into trial operation for one week. Therefore, our company arranged to enter on September 18, 2023.
The SK250 convergent spinning machine signed by our company and Luoyang Shuangrui Wind Blade Co., Ltd. on February 27th, 2023 was delivered on September 13th, 2023.
On August 15th, 2023, our company sent two OKTW700 three-wheel CNC powerful spinning machines to Jiangsu Guofu Hydrogen Energy Technology Equipment Co., Ltd.
The OKAY1400 single-wheel spinning machine signed by our company and Zhejiang Juying Fan Industry Co., Ltd. was officially installed in mid-July and put into trial operation for one week, and the delivery was arranged on August 1, 2023.